Preventive Maintenance Log
Every machine has a written schedule of maintenance tasks. Each task is done on its date, recorded and checked. This SOP sets the steps so that maintenance is planned and not only done after a breakdown.
At a glance
Nine Steps, in Order
1.List the machines
2.Set tasks from the manual
3.Fix dates on one calendar
4.Plan the stop
5.Do the task and look around
6.Record at the machine
7.Sign off with the operator
8.Chase overdue tasks
9.Review breakdowns monthly
The SOP in 2 minutes
Video goes here once it is uploaded to YouTube.
Where This Can Break
These are the points where a busy plant can slip. The PDF gives a simple fix for each.
The Full SOP to Print and Use
The PDF has the steps in full, the 10-point checklist, a fix for each break point and a 3-day plan to bring the SOP into use.
What a Written SOP Cannot Do by Itself
This SOP works on the day it is introduced. Three months later, a new technician has joined and learned the log from whoever was free. Teams change over time, so a written SOP needs three things it cannot do by itself.
- A 2-minute training video of the maintenance steps, in the language staff speak, so every new joiner learns the same way on day one.
- A local-language version of the checklist.
- A weekly 5-minute check that someone actually owns.
If your plant plans maintenance differently from this one, a 2-minute WhatsApp voice note on how it works today is enough. A written SOP in this same format comes back within 48 hours, at no cost.
WhatsApp: +91 98101 41173 (India) | +250 799 524 457 (Rwanda)
Questions People Ask
Who owns this SOP?
Maintenance head or plant head. It is done by maintenance technicians, operators and the maintenance head.
Does this replace our own rules?
No. The technical rules come from the maker’s manual and your own plant procedures. This SOP only sets the order. Have your maintenance head review it before you adopt it.
More Free Manufacturing SOPs
Free Manufacturing SOP 08 by Visionhunt. Free to use, copy and adapt. This is a general template for the process prepared by a communication and training company and not by a safety or engineering authority. The technical rules come from the maker’s manual and your own plant procedures. Have your maintenance head review it before you adopt it.